City State Program Project Description Funding Required Jobs
Pocatello ID Airport Replace Airport Fire Rescue vehicle which is at the end of its useful life 350,000 2
Pocatello ID Airport Complete air terminal expansion to improve functionality & customer service 2,500,000 20
Pocatello ID CDBG Purchase and install one UV disinfection system at Recreation Center 30,000 2
Pocatello ID CDBG Purchase and install four pre-fabricated restrooms for parks & zoo 180,000 3
Pocatello ID CDBG Purchase and install one pre-fabricated restroom/concession at sports field 130,000 3
Pocatello ID CDBG Purchase and installation of two handicap accessible play structures 76,000 3
Pocatello ID CDBG Land acquisition/demolition for expansion of the Community Recreation Center. 200,000 4
Pocatello ID CDBG Create entrepreneurial research center to help existing businesses compete 150,000 5
Pocatello ID CDBG Land purchase for State VA Cemetery 1,200,000 5
Pocatello ID CDBG Corridor improvements to South Fifth Interchange 400,000 10
Pocatello ID CDBG Curb/gutter/sidewalk/lighting improvements for resurging Warehouse District 400,000 10
Pocatello ID CDBG Redesign City parking lot to meet Fed. Clean Water Act 500,000 10
Pocatello ID CDBG Joint ISU/City accelerator research facility upgrade and rent assistance 500,000 20
Pocatello ID CDBG Re-capitalize business revolving loan fund managed by Eastern Idaho Dev Corp 400,000 20
Pocatello ID Energy 2 hybrid electric vehicles to replace existing City gas powered vehicles 80,000 2
Pocatello ID Energy Replace existing motors with variable frequency drive at Aquatics Complex 50,000 2
Pocatello ID Energy Retrofit existing lighting with energy efficient lighting at Senior Center 15,000 2
Pocatello ID Energy Energy efficient upgrades to HVAC system at the Recreation Center 75,000 3
Pocatello ID Energy 2000 (96 gallon) autocarts for curbside recycling to reduce waste 120,000 4
Pocatello ID Energy Interconnect 50 traffic signals to aid in traffic flow & reduce idling 6,060,000 4
Pocatello ID Energy Replace 500 street lights throughout the City with energy efficient LEDs 750,000 4
Pocatello ID Energy Replace heating & cooling system, including controls in Marshall Library 150,000 4
Pocatello ID Energy Retrofit lighting in Marshall Library to achieve energy efficiency 20,000 4
Pocatello ID Energy Upgrade and improve insulation of City Hall roof to achieve energy savings 200,000 4
Pocatello ID Energy Install up to 150 KW of solar panels on roof of City Hall 1,050,000 5
Pocatello ID Energy Upgrade & improve insulation of Marshall Library to achieve energy savings 75,000 6
Pocatello ID Energy GWM - Waste Heat Recovery & 16M kg C02e carbon reduction project 3,800,000 32
Pocatello ID Housing Modernization/replacement of section 236 housing for low income families 2,000,000 35
Pocatello ID Public Safety Crime analysis technology - automated link analysis & telephone analysis 20,000 1
Pocatello ID Public Safety GPS station w/laser measuring instrument for crime & accident scene analysis 20,000 1
Pocatello ID Public Safety Incident Command Vehicle w/CAD dispatching, video surveillance/MESH network 100,000 1
Pocatello ID Public Safety License plate system to check for stolen/wanted vehicles on major highways 100,000 1
Pocatello ID Public Safety Tactical transport vehicle SWAT and Crisis/Hostage Negotiations 60,000 1
Pocatello ID Public Safety Replace obsolete animal control shelter built 35 years ago to resolve safety and operational issues 2,000,000 20
Pocatello ID Schools Entry Door Replacement-various schools 162,000 5
Pocatello ID Schools Window Replacement-Irving Middle School 360,000 5
Pocatello ID Schools Modernize each classroom with first-class Instructional technology 4,500,000 10
Pocatello ID Schools Roof Replacement-Highland High School 170,000 10
Pocatello ID Schools HVAC Modernization-old Jefferson School 1,600,000 60
Pocatello ID Streets/Roads Center St Underpass - repair concrete wall, sidewalk & railing approaches 350,000 10
Pocatello ID Streets/Roads Gathe Rd & Intersection Realignment - safer for vehicles/pedestrians 600,000 20
Pocatello ID Streets/Roads Gould St Overpass Bridge - repair & seal bridge & replace approach pavement 550,000 20
Pocatello ID Transit Bus procurement, 2 large and 7 cutaway with kneeling ADA ramp equipment 764,000 5
Pocatello ID Transit Remaining funds to replace obsolete transit shop facility 1,389,000 30
Pocatello ID Water High performance-evac truck to clean & maintain storm water drains & lines 250,000 2
Pocatello ID Water Water storage rights purchases to protect Pocatello's drinking water supply 35,000,000 2
Pocatello ID Water Purchase and install 35 water meters in existing parks 350,000 5
Pocatello ID Water Construct water well house/delivery system to replace contaminated Well #30 750,000 6
Pocatello ID Water Cottonwood Lift Station improvement project 350,000 10
Pocatello ID Water Digester lid/Generator panel improvements 700,000 10
Pocatello ID Water Collection capacity, manhole, pipe lining, infrastructure improvement projects 650,000 20
Totals: $72,256,000.00 483.00
© Copyright 2008. The United States Conference of Mayors.
1620 Eye Street, Northwest - Washington, DC 20006
p. (202) 293-7330 f. (202) 293-2352 e. info@usmayors.org



(0) comments
Welcome to the discussion.
Log In